Georgia Dome
ATLANTA, GA
A $30,000,000 renovation of the Club Level, Level A Suites, Level B Suites, addition of new serving kitchen on Level B, addition of underground grease traps for entire east half of the Dome, and HVAC air distribution modifications to accommodate a new LED Ribbon Board, new lighting, and over 80 television monitors for the main and upper level concourses and concessions. The scope also included plumbing study and design for replacement of the domestic water piping risers and entire loop on the Club Level. Phase II consisted of a plumbing study and design for replacement of the domestic water piping risers and entire loop on the Lower Level.